Skip to content

Slotted Liner Pipe Project – Fast-track precision when pace mattered most

Image (99) copy

Project Overview

When a client needed 80 joints of slotted liner pipe in just four weeks, Probe delivered. Using specialist slotting capability, rapid mobilisation and high-volume production, we engineered a bespoke solution that kept a critical well-filling programme on track.

  • 3,200 ft of pipe processed
  • 56,000 precision-drilled holes completed
  • Every hole deburred and finished to specification
  • Delivered on schedule within a demanding four-week window

The Challenge

  • A specialist slotting tool had to be sourced specifically for the application.
  • Equipment was dismantled and reassembled on-site to handle the pipe dimensions.
  • Manual deburring began as a labour-intensive process before Probe introduced a semi-automated approach to boost productivity.
  • A 24/7 shift pattern in week one maximised output and protected the delivery schedule.

Result

Probe delivered a fast-track, cost-effective slotting solution at scale — where capacity, speed and engineering know-how were critical.

  • Kept the client’s programme on schedule
  • Delivered the required performance without over-engineering the solution
  • Enabled continuous 24-hour pipe running for the client
  • Demonstrated Probe’s ability to solve complex production challenges quickly